Categories
Site development

A strait and narrow way

Last October the rains fell seriously and the year was a very wet one. One of the results was a very slippery path to the woods. We decided to create a new surface with boot gripping ebony chips.

Children were involved in it all. Now they will use the new access to the woods with a sense of pride in what they have achieved.

Categories
Site development

The kitchen gets a palette wood refurbishment and more

The children missed the popular mud kitchen for a fortnight. The wait was worth it, though: the whole thing has been refitted with everything you could ask to have in your kitchen.

There is a French dresser, a hood over the solid fuelled oven and even a microwave.

A great benefit is that all is under cover.

And there is more still.

Next door to the kitchen is a new Toy Room. So now, effectively, there is a new block at the side of the sand pit.

Categories
Site development

A monument: Froebel’s second gift

From time to time, we are asked what philosophy of education we follow. Here is a fabulous statement of the answer. It is the symbol associated with the great German pioneer Friedrich Froebel (1782-1852).

The wooden monument stands 5 ft high and can be seen from all over the plat.

Froebel designed a range of ‘gifts’ – manipulatives – for use with children in his kindergartens. He regarded the second gift as the most important of them and as encapsulating his whole approach to education. It became the identifying emblem of Froebel and his work. His gravestone took the shape of the three solids arranged in the familiar configuration.

We display this symbol as a school in that great pedagogical tradition.

Categories
Site development

Modifications right up to the last week of the school year

Throughout the year, almost every week has seen improvements and developments to the site and facilities. It has been exciting and demanding. For the children, it has been marvellous to witness the construction of an outdoor kindergarten; for those of us who have been involved in the progress, there has been the satisfaction of knowing that we have done it ourselves.

One week it was the simple location of a timepiece on a section of boarding that had not been there before. The panel shelters livestock from the glare of the sunshine. The clock has not only helped the staff to know the hour but the children have been given the opportunity to learn reading the time.

A sail hung from a specially constructed frame has given much-needed shade to children reading books or building Duplo at the table.

Children were thrilled to find a climbing frame with swings one Monday morning. They could hardly be persuaded to leave it for other activities. We are immensely grateful for the kindness of the family donating (and erecting) the equipment.

Although there was much rain during the last weeks of term, when the sun shone into the kitchen, it was insufferably warm. A canopy over the window was installed to bring some relief. Decking has been used and an extension to the short flight of steps effected. The planter acts as a barrier to prevent children from falling down the side of the well.

The school year 2020-21 has been extraordinary for us. But there is more to come. Keep checking the blog for the next post. There is something beautiful to show you next time.

Categories
Site development

Development and enhancements continue apace

Almost every time you approach the plat, there will be something new. It may only be small or subtle, but if you are careful to observe, you will see that work on the site continues and improvements are constant.

For example, a little at a time, pebbled paths have been constructed.

Had you noticed the new planting of the rockery? (Unfortunately, wild rabbits see anything juicy.) Or what about the tidying up of the area around the water butt that children access?

Right under your nose, as you approach the gate to the plat, there is beautiful new furniture. Notice that the fairies found it very quickly.

The farmyard has had a major makeover. Actually, sometimes parents have looked uncertain as to where the farmyard is, and so we have labelled it to leave no doubt.

Categories
Site development

Methods of the ancients employed to erect a tower

Did you notice the dome appear to the right of the yurt? Did you wonder for what purpose there was deposited a small number of sleepers near the entrance to the plat, or how they were being moved?

In the absence of lifting gear, we adopted the methods of the builders of Stonehenge. On rollers, the great weights of timber moved too readily with the slightest slope. The problem was not so much moving them as stopping them from speeding or going in the wrong direction. Then they had to be rolled and propped until a small but solid tower was constructed.

The aim was to locate a water tank high enough to supply taps by gravity. It remains to do the plumbing and obtain the supply of clean water.

Categories
Site development

A greenhouse is the latest structure

This beautiful wooden greenhouse has been under construction for a few days and has just reached completion.

It began with the foundation made of slabs which we had waiting for the structure to be delivered.

Then assembly began.

The end result is so pleasing. Now it remains to set things up inside, and begin the serious business of raising plants from seed.

Categories
Maintenance

Our mailbox and surviving mischief

It hardly seems credible that in the past few months, we have got through two mailboxes at the gate on Potters Lane. The first was vandalised and another stolen.

So, we have replaced the commercially produced metal mailbox with a solid handmade wooden one, secured to its independent stakes.

How this stylish successor fares may depend on the reason for past attacks.

Categories
Site development

The last vulnerable gazebo has a successor

Astonishingly, the humble kitchen facilities have withstood torrential rain, gale-force winds and even the weight of snow in February. The green gazebo is weather-beaten but standing. It was time to replace it with something more sturdy.

First there came some decking for what would be an outside dining area.

We built a pergola to provide cover because rain sometimes interrupted eating.

And then came a scullery first, followed by the kitchen. An initial frustration was that the kitchen could not be completed because two panels were missing from the shed, which had been delivered. We had to wait for a couple of weeks before the finished structure was ready to transfer equipment from the tent.

At last the job is done and we are ready for a new term.

The structures are complete with a final touch …

Categories
Site development

Storm Christoph hastened the replacement of the toilet tent

At the end of December, Storm Bella wrecked the marquee. It also seriously compromised the gazebo, housing toilets, a changing unit and washbasins. Note the condition of the tent and its contents behind the marquee remains.

While the yurt and its base were under construction, it was possible to resurrect the toilet gazebo and establish a temporary refuge for the children in a large tent on our field.

Then four weeks after Storm Bella, we were severely affected by the tail end of Storm Christoph. This time, the revived but weakened gazebo was destroyed, and the temporary tent was mangled as well.

We were not entirely unprepared. Already one 6×6 shed had been delivered, and it was soon followed by a second.

So, now we have a changing room and a toilet in the smart pair of new, little structures located behind the yurt.